RUS101-Integrated Studio 2010

Saturday, October 23, 2010

Scaffold & Gangplank(23/10/10)

Final assignment issued on site.

All the knots loosen after the rope dried...





Almost finish our scaffold.

SOUL SHIFT banner reached the site.


Before I leave, I pass of studio to have a look.

Posted by Nelson at 1:57:00 AM
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Newer Post Older Post Home

Blog Archive

  • ▼  2010 (39)
    • ►  November (2)
    • ▼  October (19)
      • SHUT DOWN & My 30sec PPTX(29/10/10)
      • Preparation for SHUT DOWN
      • Opening: Conference & XZBIT
      • Dome Assembly(24/10/10)
      • Assignment 10C(1): 10 words-Transformation
      • Scaffold & Gangplank(23/10/10)
      • Strut Screwed(22/10/10)
      • Assignment 9C: Poster
      • Scaffold & Gangplank(21/10/10)
      • Bamboo Transfer(20/10/10)
      • Extra Assignment: Tensegrity
      • Assignment 10B: RUS101-XZBIT (Dymaxion)
      • Accidents & Bottom Billion
      • Assignment 9B: 1500 words paper
      • Dome Assembly(11/10/10)
      • Assignment 9A: Abstract
      • Assignment 8B: Report on Big Talk
      • Assignment 8A: Big Dome (part) Assembly
      • Assignment 7: Ibu Construction
    • ►  September (11)
    • ►  August (5)
    • ►  July (2)

About Me

Nelson
View my complete profile
Awesome Inc. theme. Theme images by TayaCho. Powered by Blogger.