Dome Assembly(24/10/10)

Help in studio before go to the dome site.







The dome construction process was going on under a hot sunny day. There are full of umbrellas around the dome during the construction process.
The scaffolds was failed so we use "man power" to support the whole dome up during the dome construction process.
Here, also a big thank to Dr. Llias for treat us lunch at Subaidah.

Posted by Nelson at 11:44:00 PM
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Newer Post Older Post Home

Blog Archive

  • ▼  2010 (39)
    • ►  November (2)
    • ▼  October (19)
      • SHUT DOWN & My 30sec PPTX(29/10/10)
      • Preparation for SHUT DOWN
      • Opening: Conference & XZBIT
      • Dome Assembly(24/10/10)
      • Assignment 10C(1): 10 words-Transformation
      • Scaffold & Gangplank(23/10/10)
      • Strut Screwed(22/10/10)
      • Assignment 9C: Poster
      • Scaffold & Gangplank(21/10/10)
      • Bamboo Transfer(20/10/10)
      • Extra Assignment: Tensegrity
      • Assignment 10B: RUS101-XZBIT (Dymaxion)
      • Accidents & Bottom Billion
      • Assignment 9B: 1500 words paper
      • Dome Assembly(11/10/10)
      • Assignment 9A: Abstract
      • Assignment 8B: Report on Big Talk
      • Assignment 8A: Big Dome (part) Assembly
      • Assignment 7: Ibu Construction
    • ►  September (11)
    • ►  August (5)
    • ►  July (2)

About Me

Nelson
View my complete profile
Awesome Inc. theme. Theme images by TayaCho. Powered by Blogger.