RUS101-Integrated Studio 2010

Monday, October 11, 2010

Dome Assembly(11/10/10)

Here come the time to construct the big dome!!!
The dome theoretical should be build upside down, but we will try to build it from the bottom up
En. Wan and Ar. Najib were there to conduct the construction.
At last the construction fail due to the problem on the struts.
We were asked to fix all of our struts in order to construct the dome up.








Posted by Nelson at 9:35:00 PM
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Newer Post Older Post Home

Blog Archive

  • ▼  2010 (39)
    • ►  November (2)
    • ▼  October (19)
      • SHUT DOWN & My 30sec PPTX(29/10/10)
      • Preparation for SHUT DOWN
      • Opening: Conference & XZBIT
      • Dome Assembly(24/10/10)
      • Assignment 10C(1): 10 words-Transformation
      • Scaffold & Gangplank(23/10/10)
      • Strut Screwed(22/10/10)
      • Assignment 9C: Poster
      • Scaffold & Gangplank(21/10/10)
      • Bamboo Transfer(20/10/10)
      • Extra Assignment: Tensegrity
      • Assignment 10B: RUS101-XZBIT (Dymaxion)
      • Accidents & Bottom Billion
      • Assignment 9B: 1500 words paper
      • Dome Assembly(11/10/10)
      • Assignment 9A: Abstract
      • Assignment 8B: Report on Big Talk
      • Assignment 8A: Big Dome (part) Assembly
      • Assignment 7: Ibu Construction
    • ►  September (11)
    • ►  August (5)
    • ►  July (2)

About Me

Nelson
View my complete profile
Awesome Inc. theme. Theme images by TayaCho. Powered by Blogger.